Hardware testing

Readiness and conformity evidence for connected products.

We assess applicable RED (Delegated Regulation 2022/30, EN 18031) and CRA requirements: supported, gap found, or not assessed — plus a clear overall statement. You receive test evidence and a documentation pack so you can sign the EU declaration of conformity and apply CE marking.

Tell us the device, firmware, target market and decision. We confirm fit, an indicative fee band and the next paid step. No bespoke test plan until a paid planning agreement.

probe Zigbee radio firmware cloud link MCU FW magnet hub
Zigbee radio · MCU · firmware · cloud link

ttyS0 example log

  1. SEC-01 network exposure PASS
  2. REL-05 internet outage RUNNING
  3. GOV-01 support period N/T

Example bench log

Services

Four ways we work

A readiness verdict, an importer check, an evidence pack, or a release desk. The agreed plan names what we run.

  • Verdict

    Regulatory readiness verdict

    For each applicable RED (Delegated Regulation 2022/30 / EN 18031) and CRA (Regulation 2024/2847) requirement: supported, gap found, or not assessed. Overall statement: the evidence in hand, with listed conditions or the blockers to fix first.

    You receive Applicability memo · requirements↔evidence matrix · bounded test evidence for the methods in your plan · technical-documentation gap list · Certificate of Test Scope & Evidence · a handoff list so you can complete and sign the EU declaration of conformity and apply CE marking

    Start with a fit check

  • Importers

    Importer due-diligence check

    Before you commit inventory, we review the documentary gates importers must clear: conformity assessment performed, technical documentation present, CE marking and EU declaration of conformity in place, and required user/manufacturer information available — then we list place-on-market blockers.

    Fit EU importers and distributors sourcing from any OEM, including non-EU makers.

    Ask about an importer check

  • Evidence pack

    Compliance evidence pack

    The building blocks behind a readiness verdict: risk-assessment facilitation, Annex VII file readiness, SBOM / vulnerability-handling review, and a private Certificate of Test Scope & Evidence. Quote as a full readiness engagement or as an add-on when you already have bench results. You use the pack to complete your technical file, sign the EU declaration of conformity and apply CE marking.

    See how the pack maps to your product

  • Release desk

    Release and OTA change assessment

    When firmware or the SBOM changes, we diff against your frozen baseline, screen materiality, triage known issues, and recommend targeted regression — or record that the baseline remains valid. Not every update is a full retest.

    Ask about a release desk

Importers

For EU importers

If you place a connected product on the EU market, you need to be able to show that the manufacturer carried out the right conformity assessment, that technical documentation exists, and that CE marking and the EU declaration of conformity are present. Our Importer due-diligence check is a fixed-scope documentary review of those gates, with a clear list of blockers and a recommended next step — including a full Regulatory readiness verdict when the OEM must remediate or prove more.

You remain responsible for your importer obligations. We give you an independent documentary file before you buy or ship stock.

Ask about an importer check

22 checks

Baseline catalogue

Our baseline catalogue describes checks and acceptance criteria we may apply. Your agreed device-specific plan selects what runs, what is N/A, and what stays not assessed.

  • SEC-01 – SEC-08 · 8

    Security

    What the product exposes, who can control it, how it talks, where it connects, and whether an update or a reset does what an owner would expect.

  • REL-01 – REL-08 · 8

    Reliability

    Whether the product can be set up, whether it does the job it claims, and whether it recovers when the network or the power does not cooperate.

  • GOV-01 – GOV-04 · 4

    Lifecycle and privacy

    What the supplier says about support, vulnerability reports, personal data, and firmware integrity — checked against documents and against what the product actually does.

  • INT-01 – INT-02 · 2

    Interoperability

    Whether the product works in the ecosystem you named, and whether it can be taken out and put back into service.

Timing

CRA reporting is already in force

Reporting obligations started.

The main requirements apply.

Regulation (EU) 2024/2847. EUR-Lex text.

Indicative

Fees follow the service

Public figures stay indicative until a written quote. Excluding VAT and sample shipping.